This 14,000m2 facility was constructed in 2024 for a listed corporate in less than 8 months and benefits from the following features:
- High stud and clear span warehouse.
- Heavy duty 50kpa slab.
- ESFR fire sprinkler system.
- Drive-through convenience via an enclosed breezeway.







